If you only have one bathroom, you will want to know how long you will be without it. Timings vary with the size of the room and the scope of work, but most projects follow the same stages.
Typical stages of a bathroom installation
- Strip-out: removing the old suite, tiles and flooring.
- First fix: altering pipework and waste, and preparing walls and floors.
- Tiling: walls and floors need time to set before grouting.
- Second fix: fitting the suite, shower, vanity, radiator and accessories.
- Finishing: sealing, final checks and cleaning.
What can make a refit take longer?
- Changing the layout or moving pipework.
- Wet room tanking, which needs drying time before tiling.
- Late delivery of tiles or products.
- Hidden problems such as damp, rot or uneven floors.
How to prepare
Order products early, clear the room and agree the plan with Frank before the start date. For a project plan specific to your home, ask for a free quote and Frank will give you a realistic timescale. You may also like our bathroom cost guide.