Full Installations · Norfolk
Bathroom Installation in Norfolk. Stripped Out, Rebuilt, Finished.
A full bathroom installation touches plumbing, walls, floors, tiling and fittings. Frank manages every stage himself, so one person is accountable from the first photo of your old suite to the final silicone bead.
RELIABLE • SKILLED • AFFORDABLE
One Trusted Specialist, Start to Finish
Sole trader · You deal directly with Frank · Frank carries out the work personally
What a full installation covers
From bare room to working bathroom
A full installation starts with the part nobody photographs: taking out the old bath, toilet, basin and tiles, then seeing what is actually behind them. Walls can be crumbling, floorboards can be soft around the waste, and old pipework is sometimes in a different place from where the new suite needs it. Frank checks these things early, so the quote reflects the real room rather than the optimistic one.
Once the room is clear, the order of work matters. First-fix pipework and waste runs go in, then wall and floor preparation, then tiling, then the suite itself, and finally sealing and a proper clean. Doing it in the wrong order is how you end up with a fresh tile scratched by a bath being lifted in. Because Frank works alone, nobody has to be coordinated and nothing waits for the next tradesperson to turn up.
Our Work shows real installations from Norfolk homes, including a grey slate-effect shower room and a compact toilet and vanity layout with wood-effect flooring, so you can judge the finish yourself.
How a typical installation runs
- Site visit or photo review, then a written quote you can compare
- Strip-out of the old suite, tiles and flooring
- Pipework and waste adjustments, plus repairs to walls and floor
- Levelling, tanking where needed, then wall and floor tiling
- Fitting the bath or shower, toilet, basin or vanity, radiator and accessories
- Grouting, sealing, final checks and a walk-round with you
Jobs this page suits
- Replacing a tired suite like for like
- Changing the layout, such as moving the toilet or basin
- Swapping a bath for a shower as part of a wider refit
- Whole-room refreshes after a house purchase
Why it runs smoothly
One person, one plan
Most delays in a refit come from hand-offs. Here there are none.
Honest scope
You see what is included before work starts.
Hidden problems
Rot and uneven floors are dealt with, not tiled over.
Tidy site
Dust and debris kept under control through the job.
Direct contact
Questions go to the person holding the tools.


Plan the layout first
Bathroom design before the strip-out begins.

Tiling
Wall and floor tiling as part of the refit.

Cost guide
What moves the price of a refit.
FAQs
Full bathroom installation questions
What homeowners ask before a full refit begins.
Yes. Strip-out is part of a full installation, and the old suite, tiles and flooring are cleared as the job progresses.
Not necessarily. Moving a basin is simple; moving a toilet depends on where the soil pipe runs and the falls available. Frank explains what is realistic at the quote.
Send photos and rough measurements by WhatsApp, or ask Frank to visit. A visit catches issues photos can miss, such as soft floors.
You can supply them or ask Frank for advice. Having everything delivered before the strip-out avoids gaps in the programme.
It depends on size and scope. The refit timeline guide on this site gives realistic ranges.
Customer Reviews
What our customers say
Guides and advice
Helpful guides before you book
Planning a full bathroom installation?
Send Frank a few photos of the room for a free, no-obligation quote.
